COMMERCIAL TERMS · T/T, L/C AT SIGHT & REALISTIC LEAD TIMES
Payment & Ordering
Clear B2B payment terms (T/T and Irrevocable L/C at Sight), realistic production schedules by truck category, milestone triggers and corporate bank-verification safeguards for international buyers.
- Standard Payment
- 30% T/T Deposit + 70% Balance Before Shipment
- Letter of Credit
- Irrevocable L/C at Sight (Accepted for Orders & Tenders)
- Stock Chassis Build
- 15–25 Working Days (Common 4×2 / 6×4 LHD Specs)
- Custom / RHD Build
- 30–55 Working Days (Factory RHD, Cranes, Fire, Reefers)
1. Payment Terms & Commercial Options at a Glance
Our commercial terms are structured for international contractors, fuel distributors, municipal procurement officers and regional truck dealers—linking every payment milestone to physical manufacturing verification:
| Payment Method | Standard Structure | Currency & Banking | Best Suited For |
|---|---|---|---|
| Telegraphic Transfer (T/T) | 30% deposit to start production; 70% balance after live video/SGS inspection & before port loading | USD (or EUR/RMB by prior agreement) to corporate bank account | Single units, fast-track builds and repeat private-sector fleets (lowest bank fees) |
| Irrevocable L/C at Sight | 100% Irrevocable L/C at Sight (or 30% T/T + 70% L/C) from approved international bank | USD via SWIFT MT700; draft reviewed prior to issuance | Multi-truck fleets, government/municipal tenders, South Asia & Africa bank-financed orders |
| Multi-Batch Fleet Schedule | Staged deposit & batch-by-batch inspection and shipment releases per contract schedule | T/T or revolving L/C aligned to 5–50+ unit delivery tranches | Large infrastructure, mining and national sanitation projects |
| Spare Parts / Accessories | 100% T/T before courier dispatch (or bundled inside truck PI at 30%/70%) | USD via corporate wire; shipped via DHL/FedEx or packed in cab | 1-year wear-parts kits and urgent post-delivery replacement components |
2. Realistic Factory Production Lead Times by Truck Type
Actual factory build time depends on two variables: whether the required OEM chassis (especially RHD or Euro V/VI) is staged in Suizhou, and the complexity of the hydraulic/specialized upper body. Use this realistic planning matrix:
| Truck Category | LHD Stock Chassis Build | Factory RHD / Custom Spec Build | Primary Lead-Time Driver |
|---|---|---|---|
| Water Tankers & Road Sprinklers | 15–22 working days | 28–40 working days | Tank material (carbon vs. 304 stainless) & anti-corrosion lining |
| Fuel Tankers & Mobile Refuelers | 18–25 working days | 30–45 working days | Compartment count, aluminum vs. steel, API bottom loading & meters |
| Dump Trucks (4×2 / 6×4 / 8×4) | 15–25 working days | 30–45 working days | Heavy mining rock body (NM400/Hardox) & Hyva hydraulic hoist |
| Garbage Compactors & Vacuum Trucks | 20–28 working days | 35–48 working days | Bin-lifter mechanism, Italian/Jurop vacuum pump or jetting system |
| Truck-Mounted Cranes & Tow Wreckers | 22–32 working days | 35–50 working days | Crane tonnage (3.2–20T boom), winch rating & reinforced subframe |
| Refrigerated Trucks & Road Sweepers | 20–30 working days | 35–50 working days | Chiller unit brand (-18°C Thermo King/Carrier/local) & auxiliary engine |
| Fire Engines, Aerial Work & Ambulances | 30–45 working days | 45–65 working days | Multi-stage boom hydraulics, fire pump certification or medical ICU fit-out |
3. Four Controlled Milestones from Deposit to Vessel Handover
If you adjust an option mid-order (such as adding a bin lifter, upgrading pump flow rate or adding custom fleet livery), our export desk issues a written Amendment Sheet confirming any price or schedule impact before proceeding:
- Step 1 — Technical Spec Lock: Written Proforma Invoice issued with attached Technical Annex (chassis model, engine HP/emission, tank/body dimensions, pump/crane model, LHD/RHD, paint color and Incoterm).
- Step 2 — Production Slot & Chassis Allocation: Deposit/L/C confirmed → VIN/chassis allocated from Dongfeng/HOWO/ISUZU/Shacman/FAW/Foton → upper-body fabrication starts immediately.
- Step 3 — Mid-Build Progress & Final Functional Test: Photos sent during welding/painting; upon completion, live video call (or SGS/BV/PVoC inspection) verifies operating pressures, hydraulics, PTO and VIN plate.
- Step 4 — Balance Release & Vessel Handover: 70% balance cleared → anti-rust marine prep → port gate-in & loading → original shipping documents couriered or Telex-released immediately after sailing.
Never wire funds to a personal account or changed bank details sent via unverified email. Before sending your first deposit, confirm the official Chengli corporate beneficiary name and SWIFT code directly on a live WhatsApp call (+8618871880125) and match it word-for-word against your stamped Proforma Invoice.
Frequently Asked Questions
Do you accept Irrevocable Letter of Credit (L/C at Sight)?
Yes. We regularly accept Irrevocable L/C at Sight issued by first-class international banks for fleet purchases, dealer orders and government/NGO tenders. Send your draft L/C clauses before opening so our finance team verifies bank charges, partial-shipment allowances and latest shipment date against production lead time.
How long does production actually take after deposit?
Production begins as soon as the 30% deposit reaches our corporate bank account (or an approved L/C is received). For standard LHD dump trucks, water tankers or fuel tankers using in-stock Suizhou chassis, factory completion typically takes 15–25 working days. Specialized builds (factory RHD chassis, high-capacity cranes, aerial buckets, fire engines, ICU ambulances) typically require 30–55 working days.
Do I have to pay the 70% balance before seeing the completed truck?
No. You only wire the remaining 70% balance after your truck is physically completed in Suizhou and passes your live video inspection (or SGS/BV/PVoC third-party verification) against the signed specification annex.
How do I verify bank account details safely before wiring a deposit?
Always verify that the bank beneficiary matches our official corporate entity (Chengli Automobile Group / authorized group export account listed on your signed Proforma Invoice) and confirm any bank detail live on WhatsApp video (+8618871880125) before executing a wire transfer. We never ask buyers to wire funds to personal accounts or unannounced third-party banks.
Ready to specify your truck?
Choose a listed model, then send your quantity, destination and working requirements.
START WITH THE TRUCK
Your next truck.<br>Let’s get specific.
Tell us what you need to move, collect or build. Our export team will help turn it into a truck specification.